Thank you for attending the 2023 HDOT Protect Our Water Conference. Please take a few minutes to fill out this questionnaire.

2023 Protect Our Water Questionnaire

Please check your agency/affiliation:

Please mark the best available answer.

1. NPDES is an abbreviation of: *
2. Storm water runoff normally discharges through the storm drain system, receiving treatment before emptying into receiving waterbodies. *
3. Who is responsible for implementing erosion and sediment controls to minimize the discharge of pollutants from construction storm water? *
4. Which of the following does not meet the requirements of a Storm Water Pollution Prevention Plan (SWPPP)?
5. A construction site inspection should cover:
6. Double perimeter controls spaced five feet apart must be installed around disturbed areas when within 50 feet of state waters and an undisturbed natural buffer less than 50 feet is between the disturbed area and state waters:
7. Construction projects with staging areas must:
8. Examples of good housekeeping measures include:
9. Perimeter controls installed around earth-disturbing work may be removed while disturbed area is being revegetated.
10. Vegetative stabilization for any exposed portions of a site through the use of seed or planted vegetation must be:
11. Overall, how would you rate the Protect Our Water Conference?